Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
日韩无码av| 999在线国产观看视频| 亚洲无码视频在线免费看| 琪琪婷婷五月色综合久久| 动态图亚洲福利在线观看| 欧美激情久久精品一区二区| 天天干天天日天天舔婷婷| 超级极品国产精品剧情av| 久久精品国产亚洲av精东| 成av一区二区三区久久| 国产精品一区二区三区麻豆| 国产国语自产精品视频一区| 国产成人亚洲精品www| 伊人久久五月天| 囗交口爆到深喉在线视频| 日本一区二区在线观看电影| 囯产精品免费视频二三区| 久久久久国产AV成人片| 亚洲午夜福利18禁噜噜噜| 狠狠婷婷综合久久久久久| 哥哥的女人在线观看完整版| 骚屄屄屄屄在线| 天天操天天摸天天操天天插| 日韩精品永久中文字幕视频| 97热精品视频免费视频| 亚洲视频一区亚洲视频一区| 久久久人妻91久久久久| 亚洲自拍清纯另类国产就| 狠狠人妻久久久久久综合| 欧美日韩中文字幕第一区| 国产精品无码免费专区午夜| 国产精品亚洲二区第一页| 免费在线观看不卡av片| 亚洲中文字幕一区女教师| 91av网在线| av激情小说色综合天天| 狠狠婷婷综合久久久久久| 久热这里只有精品伦理片| 美拍自拍偷自拍亚洲精品| 亚洲欧美熟妇综合久久久| 日本一区二区三区高清视频|